外保溫系統(tǒng)砂漿是一種聚合物增強(qiáng)的水泥基預(yù)配制干混柔性粘結(jié)砂漿奥唯。它是以水泥簸翠、石英砂违冲、德國進(jìn)口聚合物膠粘料配以多種添加劑混合機(jī)均混而成,和摻入 傳統(tǒng)建筑膠的砂漿相比具有優(yōu)良的柔韌性和粘結(jié)性能蒋毕,以及良好的抗下垂性略荡、保水性、耐水性以及簡單方便的可操作性歉胶,增強(qiáng)了基材與EPS保溫板之間的粘結(jié)強(qiáng) 度汛兜,增強(qiáng)了拉伸強(qiáng)度,防止空鼓跨扮。直接加水序无,施工方便,操作簡單衡创,工效高帝嗡。無毒、無嗅璃氢、不燃哟玷、不傷人體,不含揮發(fā)性溶劑一也,屬綠色環(huán)保產(chǎn)品巢寡。
External thermal insulation system mortar is a kind of polymer reinforced cement-based precast dry-mixed flexible bonding mortar. It is made of cement, quartz sand, German imported polymer adhesives mixed with various additives. Compared with the mortar mixed with traditional building adhesives, it has excellent flexibility and bonding performance, as well as good droop resistance, water retention, water resistance and simple and convenient maneuverability. It enhances the bonding strength between the base material and EPS insulation board, and enhances the tensile strength. Degree, prevent empty drum. Direct water addition, convenient construction, simple operation, high efficiency. Non-toxic, odorless, non-flammable, non-harmful to human body, no volatile solvents, is a green environmental protection product.
適用于外墻外保溫系統(tǒng)和外墻內(nèi)保溫系統(tǒng)上EPS 聚苯乙烯保溫板、XPS聚苯乙烯擠塑板椰苟、GRC板抑月、陶粒板和水泥板與混凝土,磚砌塊和加氣塊等基材的粘結(jié)跷塘。同時也適用于收縮率較大的保溫墻面粘貼面磚和粘貼面比較光滑的薄型大理石苗鸦、石膏板等材料的粘貼。平整跋共、堅固外羽、清潔、干燥絮很。對于新建工程捡奖,墻面的混凝土殘渣和脫模劑養(yǎng)護(hù)荊必須清理干凈,墻面平整度較差部分應(yīng)剔鑿或修補(bǔ)戚绪,表面疏松處必須剔除窍蚤,新抹灰的基層要以過硬化干燥后方可施工。
It is suitable for bonding EPS polystyrene insulation board, XPS polystyrene extrusion board, GRC board, ceramsite board and cement board with concrete, brick block and aerator on external and internal insulation system. At the same time, it is also suitable for the thermal insulation wall with larger shrinkage and the thin marble and gypsum board with smoother surface. Smooth, firm, clean and dry. For new construction projects, the concrete residue and release agent of the wall must be cleaned up, the parts with poor smoothness of the wall should be chiseled or repaired, the loose parts of the surface must be removed, and the newly plastered base should be hardened and dried before construction.
保溫粘結(jié)砂槳條粘法:先用齒狀鏝刀將攪拌好的外保溫系統(tǒng)砂漿膠粘劑均勻地涂抹在聚苯板或擠塑板上曙辛,然后用齒狀抹子在粘結(jié)砂漿上面梳理出條狀紋夏植,將保溫板粘貼在墻面上铡喊,輕柔 均勻地按壓板面使之粘結(jié)牢固,隨時用2m靠尺檢查平整度和垂直度你踩。粘板時注意清除板邊溢出的砂槳,使板與板之間無碰頭灰讳苦。點(diǎn)框法:用抹灰刀將攪拌好的外保 溫系統(tǒng)砂漿膠粘劑均勻涂抹在保溫板邊緣上形成邊框带膜,然后在板面上均勻分布5個高于邊框的粘結(jié)點(diǎn),后按上述方法將聚苯板或擠塑板粘到墻面上用靠尺靠平鸳谜。設(shè) 計要求采用機(jī)械鉚固件固定聚苯板或擠塑板時膝藕,鉚固件安裝應(yīng)少在粘結(jié)砂漿使用3天以后。

Thermal insulation bonding sand paddle sticking method: first, mix the mortar adhesive of external insulation system evenly on the polyphenyl board or extruded board with toothed trowel, then comb out the stripes on the bonded mortar with toothed plaster, paste the insulation board on the wall, press the board surface gently and evenly to make the bonding firm, check the flatness and verticality with 2m ruler at any time. Attention should be paid to removing the overflowing sand paddles at the edge of the board so that there is no contact ash between the board and the board. Point-frame method: The mortar adhesives of external thermal insulation system stirred by plastering knife are evenly applied on the edge of thermal insulation board to form a border, then five bonding points higher than the border are evenly distributed on the board surface. Finally, according to the above method, the polyphenyl board or the extruded board are bonded to the wall surface and leveled with a ruler. The design requires that when mechanical riveting firmware is used to fix polyphenyl board or extruded board, the riveting firmware shall be installed at least after 3 days of use of bonded mortar.
施工溫度大于5℃以上咐扭。嚴(yán)禁私自添加砂子芭挽、水泥及其它添加劑。O℃以下宜采用防凍型(為保證整個體系的穩(wěn)定性蝗肪,不推薦冬施)袜爪。拌制好的砂漿應(yīng)在2小時內(nèi)用完,已凝固硬化的砂槳不準(zhǔn)再用薛闪。儲運(yùn)要防潮防曬辛馆。
The construction temperature is above 5 C. It is strictly forbidden to add sand, cement and other additives without authorization. The freeze-proof type should be adopted below O C (winter application is not recommended to ensure the stability of the whole system). Mixed mortar should be used up within 2 hours, and solidified propeller should not be reused. Storage and transportation should be moistureproof and sunscreen.