灌漿料在任何工程中進(jìn)行施工操作的時(shí)候孤钦,都是有一些必要的注意事項(xiàng)哩晕,以此來(lái)保證施工,那么
濟(jì)南灌漿料施工安全規(guī)定有哪些呢卡催?下面小編為您分析:
When conducting construction operations with grouting materials in any project, there are necessary precautions to ensure construction. So what are the safety regulations for grouting material construction in Jinan? The following editor will analyze for you:
1.進(jìn)入施工現(xiàn)場(chǎng)的作業(yè)人員必須正確佩戴安全帽,嚴(yán)禁酒后上崗、施工現(xiàn)場(chǎng)嚴(yán)禁吸煙数尿、嚴(yán)禁隨地大小便。
1. Operators entering the construction site must wear safety helmets correctly, and it is strictly prohibited to work under the influence of alcohol. Smoking and urination are strictly prohibited on the construction site.
2.澆筑深基礎(chǔ)灌漿料前和在施工過(guò)程中惶楼,應(yīng)檢查基坑邊坡土質(zhì)有無(wú)崩裂塌的危險(xiǎn)右蹦。如發(fā)現(xiàn)危險(xiǎn)現(xiàn)象,應(yīng)立即排除歼捐。同時(shí)何陆,工具、材料不應(yīng)堆置在基坑邊沿豹储。
Before pouring the deep foundation grouting material and during the construction process, the soil quality of the foundation pit slope should be checked for any danger of collapse. If dangerous phenomena are found, they should be immediately eliminated. At the same time, tools and materials should not be stacked on the edge of the foundation pit.
3.澆筑灌漿料使用的溜槽及串筒節(jié)間應(yīng)連接牢固贷盲。操作部位應(yīng)有護(hù)身欄桿,不準(zhǔn)直接站在溜槽幫上操作剥扣。
3. The chute and barrel joints used for pouring grouting materials should be firmly connected. The operating parts should have protective railings, and it is not allowed to operate directly on the chute.
4.澆筑無(wú)樓板的框架梁晃洒、柱混時(shí),應(yīng)架設(shè)臨時(shí)腳手架朦乏,禁止站在梁或柱的模板或臨時(shí)支撐上操作球及。
When pouring frame beams and column concrete without floor slabs, temporary scaffolding should be erected, and it is prohibited to operate on the formwork or temporary support of the beams or columns.
5.澆筑房屋邊沿梁慢夸、柱灌漿料時(shí),外部應(yīng)有腳手架或安全網(wǎng)化歪。如腳手架平橋離開(kāi)建筑物超過(guò)20cm時(shí)咕菱,須將空隙部位牢固遮蓋或裝設(shè)安全網(wǎng)。
When pouring grouting materials for the edge beams and columns of the house, there should be scaffolding or safety nets outside. If the scaffolding flat bridge is more than 20cm away from the building, the gap must be securely covered or a safety net installed.
6.澆筑拱形結(jié)構(gòu)時(shí)敛档,應(yīng)自兩邊拱腳對(duì)稱地同時(shí)進(jìn)行;澆圈梁珍喘、雨篷、陽(yáng)臺(tái)逐次,應(yīng)設(shè)防護(hù)措施;澆筑料倉(cāng)時(shí)性谬,下出料口應(yīng)先行封閉,并搭設(shè)臨時(shí)腳手架阶徒,以防人員下墜连嘹。
6. When pouring the arch structure, it should be carried out symmetrically from both sides of the arch foot simultaneously; Protective measures should be taken for pouring ring beams, awnings, and balconies; When pouring the silo, the lower discharge outlet should be closed first and temporary scaffolding should be erected to prevent personnel from falling.
7.夜間澆筑灌漿料,應(yīng)有足夠的照明設(shè)備虚育。
7. When pouring grouting materials at night, there should be sufficient lighting equipment.
8.使用振搗器時(shí)疲狼,應(yīng)按灌漿料振搗器使用安全要求執(zhí)行,濕手不得接觸開(kāi)關(guān)衣式,電源線不得有破損和漏電寸士。開(kāi)關(guān)箱內(nèi)應(yīng)裝設(shè)防濺的漏電保護(hù)器,漏電保護(hù)器其額定漏電動(dòng)作電流應(yīng)不大于30mA碴卧,額定漏電動(dòng)作時(shí)間應(yīng)小于0.1s弱卡。
When using a vibrator, the safety requirements for using the grouting material vibrator should be followed. Wet hands should not touch the switch, and the power cord should not be damaged or leaked. A splash-proof leakage protector should be installed inside the switch box, with a rated leakage action current of no more than 30mA and a rated leakage action time of less than 0.1s.
9.筑作業(yè)必須設(shè)專人指揮,分工明確住册。
9. The construction work must be commanded by a dedicated person with a clear division of labor.
10.灌漿料振搗器使用前必須經(jīng)過(guò)電工檢查確認(rèn)合格后方可使用谐宙,開(kāi)關(guān)箱內(nèi)必須裝置漏電保護(hù)器,插座插頭應(yīng)完好無(wú)損界弧,電源線不得破皮漏電;操作者必須穿絕緣鞋凡蜻,戴絕緣手套。
10. Before using the grouting material vibrator, it must be inspected and confirmed by an electrician to be qualified before use. A leakage protector must be installed in the switch box, the socket plug should be intact, and the power cord should not be broken or leaked; Operators must wear insulated shoes and gloves.

11.在溝槽垢箕、基抗中澆注灌漿料前應(yīng)檢查槽幫划栓,確認(rèn)安全后方可作業(yè)。
11. Before pouring grouting material into the groove and foundation, the groove edge should be inspected and confirmed to be safe before operation.
12.溝槽深度大于3m時(shí)条获,應(yīng)設(shè)置灌漿料溜槽忠荞,溜槽間節(jié)必須連接可靠,操作部位應(yīng)設(shè)防護(hù)欄罪焰,不得直接站在溜放槽幫上操作锌瓤。溜放時(shí)作業(yè)人員應(yīng)協(xié)調(diào)配合。
When the depth of the groove is greater than 3m, a grouting material chute should be set up, and the joints between the chutes must be reliably connected. The operating parts should be equipped with protective barriers, and it is not allowed to directly stand on the chute side for operation. Operators should coordinate and cooperate when sliding.
13.泵送灌漿料時(shí),宜設(shè)2名以上人員牽引布料桿铝琐。泵送管接口家漂、安全閥、管架等必須安裝牢固瑟毡,輸送前應(yīng)試送斯癞,檢修時(shí)必須卸壓。
13. When pumping grouting materials, it is advisable to have at least 2 personnel pull the distribution rod. The pumping pipe interface, safety valve, pipe rack, etc. must be installed firmly, and should be tested before transportation. During maintenance, pressure must be relieved.
14.澆筑拱型結(jié)構(gòu)伸果,應(yīng)自兩邊拱腳對(duì)稱同時(shí)進(jìn)行板薛,澆筑圈梁、雨蓬刊搁、陽(yáng)臺(tái)應(yīng)設(shè)置安全防護(hù)設(shè)施石葫。
14. The pouring of arch structures should be carried out symmetrically and simultaneously from both sides of the arch feet. The pouring of ring beams, awnings, and balconies should be equipped with safety protection facilities.
15.澆灌2m高度以上框架柱、梁灌漿料應(yīng)站在腳手架或平臺(tái)上作業(yè)钻局,不得直接站在模板或支撐上操作汰寓。澆灌人員不得直接在鋼筋上踩踏、行走赏淌。
15. Grouting for frame columns and beams with a height of more than 2m should be done by standing on scaffolding or platforms, and should not be done directly on templates or supports. Pouring personnel are not allowed to step or walk directly on the steel bars.
16.向模板內(nèi)灌注灌漿料時(shí),作業(yè)人員應(yīng)協(xié)調(diào)配合啄清,灌注人員應(yīng)聽(tīng)從振搗人員的指揮六水。
16. When pouring grouting material into the template, the operators should coordinate and cooperate, and the pouring personnel should follow the command of the vibrating personnel.
17.澆筑灌漿料作業(yè)時(shí),模板倉(cāng)內(nèi)照明用電必須使用12V低壓辣卒。
17. When pouring grouting materials, 12V low voltage must be used for lighting in the template warehouse.
18.預(yù)應(yīng)力灌漿應(yīng)嚴(yán)格按照規(guī)定壓力進(jìn)行掷贾,輸漿管道應(yīng)暢通,閥門接頭應(yīng)嚴(yán)密牢固荣茫。
18. Prestressed grouting should be strictly carried out according to the specified pressure, the slurry pipeline should be unobstructed, and the valve joints should be tight and firm.
有關(guān)對(duì)于灌漿料施工安全規(guī)定有哪些呢想帅,暫時(shí)為大家介紹到這里,如果您對(duì)其講述還有其他疑問(wèn)或者不了解之處啡莉,可直接咨詢我們工作人員港准,也歡迎來(lái)電
http://m.bjtsdc.com咨詢探討!
What are the safety regulations for grouting material construction? I will briefly introduce them here. If you have any other questions or are not familiar with them, you can directly consult our professional staff. You are also welcome to call us http://m.bjtsdc.com Consultation and discussion!