It's no stranger to plastering mortar. Generally, the improved dry powder mortar is used and the dry powder material mixed with better stone well cement is used. What's the construction technology of machine spraying mortar? Let's give you a brief introduction:
粉刷砂漿產(chǎn)品特點(diǎn):
Features of plastering mortar products:
1隆惊、現(xiàn)場(chǎng)加水?dāng)嚢杓纯墒┕づ雎欤」な×希┕し奖愕缍擅黠@提高施工效率蛀田,減小工作強(qiáng)度。
1. The construction can be carried out by adding water and mixing on site, which saves labor and materials and is convenient for construction. It can significantly improve the construction efficiency and reduce the work intensity.
2褂洽、產(chǎn)品質(zhì)量可靠均勻乖阐,保證地面砂漿的強(qiáng)度,收縮低痛祈,減少收縮裂縫亦誊。
2. The product quality is reliable and uniform, ensuring the strength of the ground mortar, low shrinkage and reducing shrinkage cracks.

3、具有較高的施工性能暴撼,和易性好傻丝,施工滑爽,均勻平整诉儒。
3. It has high construction performance, good workability, smooth and even construction.
4葡缰、提高施工現(xiàn)場(chǎng)的整潔度,無(wú)需水泥忱反、黃砂等大綜原料的堆放場(chǎng)地泛释,可節(jié)省大量人力。
4. Improve the cleanliness of the construction site without the storage yard of large comprehensive raw materials such as cement and yellow sand, which can save a lot of manpower.
粉刷砂漿施工工藝:
Construction process of plastering mortar:
1缭受、面層砂漿的鋪設(shè)宜在室內(nèi)裝飾工程基本完成后進(jìn)行胁澳。
1. The laying of surface mortar should be carried out after the indoor decoration works are basically completed.
2该互、地面砂漿鋪設(shè)時(shí),應(yīng)隨鋪隨壓實(shí)韭畸。抹平宇智、壓實(shí)工作應(yīng)在砂漿凝結(jié)前完成。
2. When the ground mortar is laid, it shall be compacted at the same time. The leveling and compaction shall be completed before the mortar sets.
3胰丁、做踢腳線前随橘,應(yīng)彈好水平控制線,并應(yīng)采取措施控制出墻厚度一致熔又。踢腳線突出墻面厚度不應(yīng)大于8 mm
3. Before making the skirting line, snap the horizontal control line, and take measures to control the thickness of the wall. The thickness of skirting line protruding from the wall shall not be greater than 8 mm
4协伴、踏步面層施工時(shí),應(yīng)采取保證每級(jí)踏步尺寸均勻的措施非宝,且誤差不應(yīng)大于10 mm杨趣。
4. During the construction of step surface layer, measures shall be taken to ensure the uniform size of each step, and the error shall not be greater than 10 mm.
5、地面砂漿鋪設(shè)時(shí)宜設(shè)置分格縫券转,分隔縫間距不宜大于6 m凡搪。
5. When laying the ground mortar, the dividing joint should be set, and the spacing of the dividing joint should not be greater than 6 m.
6、地面面層砂漿凝結(jié)后樊悬,應(yīng)及時(shí)養(yǎng)護(hù)轨凡,養(yǎng)護(hù)時(shí)間不應(yīng)少于七天。
6. After the mortar on the ground surface is set, it shall be cured in time, and the curing time shall not be less than seven days.
7谋哼、地面砂漿施工完成后文紧,應(yīng)采取措施防止玷污和損壞。面層砂漿的抗壓強(qiáng)度未達(dá)到設(shè)計(jì)要求前缩铸,應(yīng)采取保護(hù)措施俭谨。
7. After the construction of ground mortar is completed, measures shall be taken to prevent contamination and damage. Protective measures shall be taken before the compressive strength of the surface mortar fails to meet the design requirements.
河南粘結(jié)砂漿
Henan bonded mortar
粉刷砂漿注意事項(xiàng):
Precautions for plastering mortar:
1、施工前财岔,打掃干凈地面的浮灰或油污风皿,并用水充分濕潤(rùn)。
1. Before construction, clean the floating ash or oil stain on the ground and fully wet it with water.
2匠璧、使用機(jī)械攪拌,加水量約為百分之十五咸这,加水量不易過(guò)大夷恍,否則會(huì)出現(xiàn)表面起砂的現(xiàn)象。
2. Mechanical mixing is used, and the amount of water added is about 15%. The amount of water added is not easy to be too large, otherwise there will be sand on the surface.
3媳维、施工厚度根據(jù)地面的平整度要求酿雪,厚度超過(guò)1 0 mm以上,要分層施工侄刽,需要時(shí)要留收縮縫指黎。24h后朋凉,要澆水養(yǎng)護(hù),溫度較高時(shí)醋安,還要注意鋪設(shè)麻布或稻草杂彭,減少水分蒸發(fā),造成收縮開(kāi)裂侠森。
3. The construction thickness shall be based on the flatness requirements of the ground. If the thickness exceeds 10 mm, it shall be constructed in layers, and contraction joints shall be reserved when necessary. After 24h, water for curing. When the temperature is high, pay attention to laying linen or straw to reduce water evaporation and cause shrinkage and cracking.
4嘱峦、使用中遇雨雪天氣應(yīng)停止施工,抹灰砂漿硬化前應(yīng)防止雨淋磺勋,普通型產(chǎn)品不能用于冬季施工侍除;
4. In case of rain and snow during use, the construction shall be stopped. The plastering mortar shall be protected from rain before hardening. Ordinary products cannot be used for winter construction;