如今的城市中各種樓房大夏密密麻麻,有種“欲與天公試比高”的覺得刽巍。事實(shí)上這些大廈的建成都離不開外墻保溫砂漿的運(yùn)用,外墻保溫砂漿不只能維護(hù)內(nèi)層材料寿经,讓修建愈加堅(jiān)固結(jié)實(shí)鹦堕,并且還可以讓修建表面平整潤(rùn)滑的同時(shí)具有著防水的能。
Nowadays, there are many buildings in the city in summer. There is a feeling of "trying to compete with the heavenly Father". In fact, the construction of these buildings can not be separated from the use of external wall thermal insulation mortar. The external wall thermal insulation mortar can not only maintain the inner layer materials, making the construction more solid and solid, but also make the construction surface smooth and smooth with waterproof function.
下面濟(jì)南抹面砂漿公司帶我們理解下外墻保溫砂漿的施工操作流程:
Jinan plastering mortar Co., Ltd. takes us to understand the construction process of exterior wall thermal insulation mortar:
1.外墻保溫砂漿運(yùn)用前要先與水?dāng)嚢?:2份額剖坟,攪拌后當(dāng)即運(yùn)用啡洁。
1. The external wall thermal insulation mortar shall be mixed with water for 1:2 before application, and shall be applied immediately after mixing.
2.為了保證施工前表面潔凈平整、無(wú)油漬疙汁,一些沉浮、斷裂幅之、松動(dòng)语哺、風(fēng)化的局部也要提早根除。
2. In order to ensure that the surface is clean, flat and free of oil stains before construction, some floating, broken, loose and weathered parts should also be eradicated in advance.
3.對(duì)混凝土墻體和砌塊墻體施工時(shí)應(yīng)涂滿砂漿膠粉刑炎。在涂改層時(shí)厚度不能大于10mm忽仗,今后每層厚度不能大于20mm,兩次施工時(shí)辰應(yīng)該距離24小時(shí)以上浦译。
3. The concrete wall and block wall shall be coated with mortar powder during construction. When the first layer is altered, the thickness shall not be greater than 10 mm. In the future, the thickness of each layer shall not be greater than 20 mm. The two construction hours shall be more than 24 hours away.
4.在抗裂層中用金屬網(wǎng)替代網(wǎng)格布作為加強(qiáng)骨架棒假,使其銜接結(jié)實(shí)。等保溫層單調(diào)今后才干夠停止抗裂保溫施工精盅。
4. In the anti crack layer, the metal mesh is used instead of the mesh cloth as the reinforcing framework to make it connected firmly. Only when the insulation layer is monotonous can the anti crack insulation construction be stopped in the future.
5.在保溫層帽哑、維護(hù)層單調(diào)前首要做到避免水沖、碰擊叹俏、和震動(dòng)妻枕。兩者的施工應(yīng)該依照國(guó)度規(guī)范規(guī)劃,施工厚度不允許有負(fù)誤差粘驰。
5. Before the insulation layer and maintenance layer are monotonous, avoid water flushing, bumping and vibration. The construction of the two should be in accordance with the national standard planning, the construction thickness is not allowed to have negative error.
別的還要留意的是屡谐,外墻保溫砂漿消費(fèi)時(shí)要操控砂的含水率,由于假如砂的含水率過高蝌数,砂特別簡(jiǎn)單粘結(jié)成團(tuán)愕掏,砂粒也更易賭賽篩網(wǎng),更終會(huì)招致篩分效率降低顶伞。所以饵撑,這一切只要準(zhǔn)備好了才干順利完成砂漿施工。
In addition, it should be noted that the water content of the sand should be controlled when the external wall thermal insulation mortar is consumed, because if the water content of the sand is too high, the sand is particularly simple to bond into a group, and the sand particles are more likely to bet on the screen, which will eventually lead to the reduction of screening efficiency. Therefore, as long as all these are ready, the mortar construction can be completed smoothly.
The above is the relevant content introduced by Jinan plastering mortar manufacturer. For more information, please visit the website: http://m.bjtsdc.com