想保證石膏粉施工的完好发钝,要嚴(yán)格按照?qǐng)?zhí)行標(biāo)準(zhǔn)來操作姐阎。對(duì)于石膏粉施工執(zhí)行標(biāo)準(zhǔn)速和,我們也整理了一些信息标宪。
In order to ensure the completion of gypsum powder construction, it is necessary to strictly follow the implementation standards. For the implementation standard of gypsum powder construction, we also collated some information.
首先滚讼,脫硫石膏粉生產(chǎn)設(shè)備施工前對(duì)基層的處理是極有必要的,要確本隹基層平整,如有凹凸不平處需及時(shí)處理;根據(jù)基層墻面的吸水率進(jìn)行濕潤(rùn)散岩,待表面無浮水再進(jìn)行抹灰施工酿乾。
First of all, it is very necessary to treat the base before the construction of desulfurization gypsum powder production equipment. It is necessary to ensure the level of the base, if there are bumps, to deal with them in time; wet the base wall according to the water absorption rate, and then plaster the surface without floating water.
用石膏粉配制的砂漿的抹灰工藝與傳統(tǒng)抹灰工藝相同,需要按規(guī)定掛線萌圣,找規(guī)矩進(jìn)行墻面抹灰渣蒙。石膏粉的具體施工方法如下所述:
The plastering process of mortar prepared with gypsum powder is the same as that of traditional plastering process. It needs to hang wires according to the regulations and find rules for wall plastering. The concrete construction method of gypsum powder is as follows:
1根據(jù)設(shè)計(jì)要求、工程造價(jià)等實(shí)際情況來選擇底層砂漿配合比低海,然后進(jìn)行墻面抹灰缔寒。
1. Select the mix proportion of bottom mortar according to the design requirements, engineering cost and other actual conditions, and then carry out wall plastering.
2按傳統(tǒng)工藝對(duì)內(nèi)墻及頂棚進(jìn)行抹灰刮糙挪其,依據(jù)標(biāo)志及標(biāo)筋用刮杠刮平,后用木砂板搓平壓實(shí)感细。
2. According to the traditional technology, plastering and scraping the interior wall and ceiling, scraping with scraper according to the sign and reinforcement, and finally rubbing and compacting with wood sand board.

3脫硫石膏粉生產(chǎn)設(shè)備可采用凈漿或混合料漿作為面層抹灰材料什猖,用水量要以適應(yīng)氣候條件、便于施工為宜红淡。拌灰量要適宜不狮,確保當(dāng)天能用完,避免造成浪費(fèi)在旱。在底層砂漿差不多七八成干時(shí)進(jìn)行面層抹灰摇零,用鐵板壓實(shí)壓光。
3. Clean slurry or mixed slurry can be used as surface plastering material for desulfurization gypsum powder production equipment. The water consumption should be adapted to climatic conditions and convenient for construction. The amount of ash mixing should be appropriate to ensure that it can be used up on the same day, so as to avoid waste. When the bottom mortar is about 78% dry, the surface is plastered and compacted with iron plate.
4等面層抹完12-24小時(shí)后桶蝎,用細(xì)砂紙將表面紋路抹平驻仅,再用濕布擦洗一遍便可達(dá)到中高級(jí)抹灰標(biāo)準(zhǔn)。
4. After 12-24 hours of plastering, the surface lines are smoothed with fine sandpaper, and then scrubbed with a wet cloth to reach the intermediate and advanced plastering standards.
Today's content is introduced here. If you have any other questions about Jinan gypsum powder, you are welcome to click on our official website for consultation: http://m.bjtsdc.com./