粉刷石膏作為一種新的綠色建筑內(nèi)墻石膏找平材料,具有良好的和易性,保水性蜒金、粘附性能好,水泥漿水化,和強(qiáng)堿物質(zhì)結(jié)合的特點(diǎn),目前越來越多的廣泛應(yīng)用于建筑內(nèi)墻石膏,因此懷疑增加對粉刷石膏相關(guān)問題,如:如何用粉刷石膏?你刮了幾次膏藥?灰泥有多厚?等一下!針對這些問題湿硝,為您解答問題。
As a new kind of green building interior wall plaster leveling material, plastering gypsum is widely used in building interior wall gypsum nowadays because of its good workability, good water retention, good adhesion, cement slurry hydration and strong alkali combination. Therefore, it is doubtful to increase the related problems of plastering gypsum, such as: how to use plastering gypsum? How many times have you scraped the plaster? How thick is the mortar? Wait a minute! To solve these problems, please.
灰泥主要用于建筑內(nèi)墻混凝土、加氣混凝土、磚灰墻及天花板灰泥找平⌒峡澹基礎(chǔ)課程治療:為了保證公司債券之間的表面畫石膏和基礎(chǔ)課,掃帚和鋼絲刷等工具應(yīng)該被用來清理漂浮的灰塵和碎片的基本課程,和修復(fù)和踢平的表面的凹凸部分基礎(chǔ)課程。確毙T觯基層干凈黔攀、平整、堅(jiān)實(shí)茁只,確保抹灰后無空鼓膛胜、脫落等現(xiàn)象缔莲。如果基層松散或光滑,應(yīng)使用標(biāo)準(zhǔn)稀釋滲透界面劑進(jìn)行滲透壓實(shí)界面處理霉旗。如果底座太干痴奏,可以用水打濕墻面底座,但不能有清水厌秒。
The mortar is mainly used for building interior wall concrete, aerated concrete, brick mortar wall and ceiling mortar leveling. Basic Course Therapy: In order to ensure surface plaster and basic courses between corporate bonds, tools such as brooms and wire brushes should be used to clean up floating dust and debris, and basic courses to repair and flatten concave and convex surfaces. Ensure that the grass-roots is clean, smooth and firm, and that there is no empty drum and falling off after plastering. If the base is loose or smooth, the osmotic compaction interface should be treated with standard dilution osmotic interface agent. If the base is too dry, water can be used to wet the wall base, but not clear water.
濟(jì)南石膏粉:粉刷石膏怎樣用
Jinan gypsum powder: how to use plastering gypsum部署粉刷石膏漿:根據(jù)合適的粉水比(粉刷石膏粉:水= 4:1,實(shí)際的水比在實(shí)際施工一致性),加水?dāng)嚢柰?然后加入粉刷石膏粉,用電動(dòng)攪拌機(jī),混合無粉粉粉刷石膏漿達(dá)到所需的一致性,腌5分鐘,攪拌均勻后再批后方可施工读拆。抹灰:每次抹灰厚度控制在5mm左右。抹灰厚度大的鸵闪,應(yīng)嚴(yán)格分層抹灰找平檐晕。根據(jù)抹灰部位確定抹灰順序“鏊希可以先壓天花板辟灰,再壓墻壁,先上后下(如果工人操作順利篡石,也可以從底部向上擦拭)芥喇,從門的一側(cè)開始,從另一側(cè)退出凰萨,整個(gè)墻面連續(xù)工作继控。混凝土天花板可以成功地用灰泥抹灰笤碍。如果平整度差太大况饥,可以先擦底灰(薄而厚的刷膏膏),然后再擦第二次壓光肘抒。第二次抹灰找平施工需要一層抹灰配赊,抹灰層后設(shè)置好后母卵,用刮尺沿著墻面垂直水平方向刮抹灰餅找平任感,直到找平為止,用木抹灰機(jī)搓毛壓實(shí)慈柑。
Deployment of plastering gypsum slurry: according to the appropriate powder-water ratio (plastering gypsum powder: water = 4:1, the actual water ratio is consistent in the actual construction), add water mixing barrel, then add plastering gypsum powder, use electric mixer, mix plastering gypsum slurry without powder to achieve the required consistency, marinate for 5 minutes, mix evenly before batch construction. Plastering: The thickness of each plastering should be controlled at about 5 mm. If the plastering thickness is large, the plastering level should be strictly stratified. The plastering sequence is determined according to the plastering position. You can press the ceiling first, then the wall, first up and then down (if the worker operates smoothly, you can also wipe from the bottom up), from one side of the door, from the other side to exit, the whole wall continues to work. Concrete ceilings can be successfully plastered with mortar. If the flatness difference is too big, you can first rub the bottom ash (thin and thick paste), and then rub the second calendering. The second plastering leveling construction needs a layer of plastering. After the plastering layer is finally set up, the plastering cake is leveled along the vertical and horizontal direction of the wall surface with a scraper ruler until leveling, and is rubbed and compacted with a wooden plastering machine.
1. 灰泥施工環(huán)境溫度應(yīng)在5℃~ 35℃之間乳吉,養(yǎng)護(hù)溫度不低于0℃;2. 注意分配粉末狀膏體的水灰比,加水過多不易對墻體形成水波菱计,加水過少不易施工且不易采光;2. 施工底漆灰泥不應(yīng)透水醋躏,不應(yīng)太濕;3.配制好的石膏膏應(yīng)在初凝前使用,一般約1小時(shí);4. 灰泥攪拌壤生、涂刷工具用完后應(yīng)及時(shí)清理干凈擒买。
1. The ambient temperature of cement construction should be between 5 and 35 C, and the curing temperature should not be less than 0 C. 2. Pay attention to the water-cement ratio of powder gypsum, too much water is not easy to form water waves on the wall, too little water is not easy to construct and not easy to light; 2. Construction primer mortar should not be permeable and too wet; 3. Prepared gypsum should be used before initial setting. It usually lasts about 1 hour. 4. When the mortar mixing and brushing tools are used up, they should be cleaned up in time.
以上是
濟(jì)南石膏粉廠家為大家整理的相關(guān)內(nèi)容,想要了解更多內(nèi)容耀里,歡迎訪問網(wǎng)站:http://m.bjtsdc.comThe above is the related content of Jinan gypsum powder factory for you. For more information, please visit the website: http://m.bjtsdc.com.